Back to Modalities

Textual Modality for: 344403.2 - Roof drainage equipment

Code Title Description Word Counts URL
344403.2 Fact Sheet 3.3.2: Roof Systems— Low-Slope Roofs - FEMA.govPDF Roof systems can be classified by roof shape and building size. As shown in Figure 3.3.2.1, low-slop... Total words: 4,032 | roof: 108 | drainage: 4 | equipment: 34 View
344403.2 780 CMR 15.00 ROOF ASSEMBLIES AND ROOFTOP STRUCTURES - Mass.govPDF [P] 1503.4 Roof Drainage. Desig n and installation of roof drainage systems shall comply with 248 CM... Total words: 11,616 | roof: 234 | drainage: 3 | equipment: 5 View
344403.2 2021 Uniform Mechanical Code - Austin, Texas 303.8.4 Roof Drainage and Rails. Equipment shall must be installed on a well-drained surface of the ... Total words: 2,795 | roof: 4 | drainage: 1 | equipment: 13 View
344403.2 ROOF RUNOFF STRUCTURE - USDA Roof runoff can empty into a subsurface drain, underground outlet, a ground gutter, a storage tank o... Total words: 1,417 | roof: 26 | drainage: 2 | equipment: 1 View
344403.2 4.6 Blue Roofs – Development Services Download summaries of this SMP and its maintenance guidance, with quick reference information for cl... Total words: 3,580 | roof: 103 | drainage: 3 View
344403.2 Rooftop Storage Guidance and Criteria - Washington, D.C.PDF 7. The maximum time of drawdown on the roof shall not exceed 17 hours. 8. Josam Manufacturing Compan... Total words: 896 | roof: 20 | drainage: 1 View
344403.2 Stormwater Management Manual 2.3.4 Eco-Roof Facility Description Eco-Roofs Drainage Layer (if needed): There are numerous ways to provide drainage. Products range from manufac... Total words: 1,618 | roof: 24 | drainage: 4 View
344403.2 facilities. NIH Project Officers, A/E’s and other consultants to the ...PDF Drippage around drain bodies (whether roof drains or even floor drains receiving cold condensate) ca... Total words: 1,311 | roof: 1 | drainage: 2 | equipment: 2 View
344403.2 Falls and Other Hazards to Workers Removing Snow from Rooftops and ...PDF removal. Workers may fall off roof edges, through skylights, and from ladders and aerial lifts. Work... Total words: 3,420 | roof: 49 | equipment: 33 View
344403.2 Chapter 3.1 Storm Drainage Sizing - CT.govPDF Code addresses if equipment such as air conditioning units or similar devices discharge onto a roof,... Total words: 762 | roof: 33 | drainage: 9 | equipment: 1 View
344403.2 Sources of Flat Roof Failures - Inspection Guidance - GSA This standard includes guidance on identifying sources of flat roof failures by looking at specific ... Total words: 1,014 | roof: 10 | drainage: 3 View
344403.2 The influence of a green roof drainage layer on retention ... - PubMed The aim of the research was to determine the influence of the substrate and different drainage mater... Total words: 1,111 | roof: 7 | drainage: 3 | equipment: 1 View
344403.2 PHSKC - PLAN REVIEW DESIGN GUIDANCE - King CountyPDF W. All Drains (floor drains, garage drains, hub drains, trench drains, roof drains, etc - w/Tags) X.... Total words: 3,961 | roof: 10 | drainage: 5 | equipment: 18 View
344403.2 Chapter 3.1 Storm Drainage Sizing - CT.govPDF Code addresses if equipment such as air conditioning units or similar devices discharge onto a roof,... Total words: 762 | roof: 33 | drainage: 9 | equipment: 1 View
344403.2 Section XV - Chapter 76 - Census.govPDF 7610.90.0020 - - - Sheet-metal roofing, siding, flooring, and roof guttering and other drainage equi... Total words: 1,386 | roof: 1 | drainage: 1 | equipment: 3 View
344403.2 A generic hydrological model for a green roof drainage layer A rainfall simulator of length 5 m and width 1 m was used to supply constant intensity and largely s... Total words: 947 | roof: 10 | drainage: 3 View
344403.2 ROOF SUPPLEMENTAL FORM - flaglercounty.govPDF (Pitch) of Roof ____/12” Positive Drainage? If No, how will it be ... It is up to the contractor t... Total words: 255 | roof: 12 | drainage: 1 View
344403.2 ROOF: GENERAL NOTES 4. all flat roof slopes shall be tapered 1/4":12 as shown on plan and shall maintain the minumum thi... Total words: 448 | roof: 14 | drainage: 1 | equipment: 2 View
344403.2 Project Requirements: Design Professionals - Plumbing - Buildings - NYC.gov High Pressure Gas Piping. Per FGC Section 403.1.1, all welded gas distribution piping is subject to ... Total words: 2,361 | roof: 3 | drainage: 5 | equipment: 11 View
344403.2 3.2 Green Roofs - Washington, D.C.PDF material and equipment storage is required, rooftop storage areas must be identified and clearly mar... Total words: 5,558 | roof: 145 | drainage: 31 | equipment: 3 View
Mostrando 1 a 20 de 1012 resultados
« Anterior 12345...51 Siguiente »